[Case Study] Achieving Significant Reduction in Workload
By purchasing in specified dimensions, unnecessary inventory is reduced! Case study on the introduction of wrap tubes.
The company S, a manufacturer of Automated Guided Vehicles (AGVs), has adopted wrap tubes for cable protection in their AGVs. Previously, the cables extending from the AGVs were bundled and protected using spiral tubes. The spiral tubes required about 10 minutes of installation time per meter, but with the use of wrap tubes, the installation time has been reduced to approximately one-tenth. We have also received positive feedback regarding the improved appearance. Furthermore, by cutting to specified dimensions at our company, we have been able to reduce unnecessary inventory, and by using a heat cutter for cutting, we have also achieved a reduction in the labor required for post-cutting terminal processing. [Overview] ■ Issues - The conventional installation method takes time, so we want to reduce labor and increase production efficiency. - We also want to reduce labor during maintenance. ■ Requests - We would like you to propose products that lead to labor reduction. - Since this will be used in mass production machines, we would like it delivered cut to the required dimensions. *For more details, please refer to the PDF materials or feel free to contact us.
- Company:興和化成
- Price:Other
![[Case Study] Achieving Significant Reduction in Workload](https://image.mono.ipros.com/public/product/image/8e3/2000762512/IPROS80736709082537210121.png?w=280&h=280) 
 